Before/After of the shop. Above is the raw space with framing, probably about 4 weeks into construction. Below is last week, the [mostly] final product. So excited.

Caption

Before/After of the shop. Above is the raw space with framing, probably about 4 weeks into construction. Below is last week, the [mostly] final product. So excited.

Posted

  • 4 days ago on Thursday
  • September 11th, 2014 at 1:43am